PROCESS / 04 — INSTALL
A clear, controlled path from survey to handover
From the first site visit to final testing, each stage is documented, signed off, and aligned with your specifications—so installation is predictable, safe, and audit-ready.
P-01
Survey & Scope
We review site conditions, access, and existing systems, then confirm tank type, capacity, and standards before issuing a clear scope and quotation.
P-02
Design & Plan
We finalize dimensions, base/support requirements, connections, and schedule—coordinating with your team to prevent clashes and downtime on site.
P-03
Install & Assemble
Our technicians assemble panels or tanks, fit piping and accessories, and complete GRP lining or ladder works where required—following approved method statements.
P-04
Test & Handover
We complete leakage and functional checks, verify workmanship, and hand over documentation for your records—ready for operation, inspection, and maintenance.

SHEET / 02 — OUR PROCESS
A clear, site-ready method for GRP tank projects.
From first call to handover, we run a structured process built for contractors and facility teams. We confirm capacity and specifications, survey the site, plan access and safety, then execute installation with experienced supervisors on the ground.
You get traceable documentation at each stage—survey notes, drawings/spec confirmation, QA checklists, and testing results—so approvals are faster and performance is easy to verify long after commissioning.
Single point of contact
P-01 — ONE TEAM, ONE LEAD
Specs & QA documented
P-02 — RECORDS YOU CAN AUDIT
Tested before handover
P-03 — CHECKS DONE ON SITE
Safety-led execution
P-04 — METHOD STATEMENTS FIRST
DOC / 05 — QUOTATION REQUEST
Ready to confirm specs and schedule installation?
Send your tank type, capacity, site location, and any drawings or photos. Our team will review the requirements and return a clear scope, timeline, and quotation—built for contractor and facility approvals.
REPLY ≤ 48H
SITE VISIT AVAILABLE
REV 01
S-01 — SCOPE CONFIRMED
After a quick review of your requirements, we confirm specs, access constraints, and the installation plan—so procurement and site teams can move fast.